About this document
Al Khobar Desalination Plant Checklist by Munir Choudary is a document available to read on EtoBox.
The document outlines the pre-energisation checklist for the Al Khobar Sea Water Reverse Osmosis Desalination Plant -2. It includes necessary prerequisites for energisation, such as QA completion, risk control measures, and safety checks. The checklist requires signatures from the commissioning lead, officer, and manager to confirm all safety measures are in place before energising the system.
- Author
- Munir Choudary
- Language
- EN