Can I read Cost Estimate for Shadiyabad Culvert on EtoBox?
Cost Estimate for Shadiyabad Culvert by Sanjeev Kumar Singh is a document available to read on EtoBox.
What is Cost Estimate for Shadiyabad Culvert about?
This document provides an analysis of rates for supply and laying of RCC hume pipes of various diameters for a construction project. It analyzes the schedule of rates (SOR) and includes a 10% cost for cartage from the factory to the work site. Rates are provided for 1000mm, 600mm and 350mm diameter NP3 hume pipes, ranging from Rs. 4840 to Rs. 1320 per running meter. The analysis was prepared by a Junior Engineer and signed off by the Assistant Engineer and Executive Engineer.
- Author
- Sanjeev Kumar Singh
- Language
- EN