Electrical System Remodeling Schedule by ScribdTranslations is a document available to read on EtoBox.
This work schedule details the remodeling activities of the electrical system of the existing workshops at Senati Chimbote to be carried out over 5 weeks. The first week will focus on safety and health and provisional works. In the second and third weeks, preliminary works such as layout, re-marking, wall and floor cuts, and installation of piping and panels will be carried out. In the fourth week, conductors and panels will be installed. Finally, in the fifth week, emergency lighting will be installed.