About this document
PLN Connection and Deep Well Upgrade by Andi Wardiana is a document available to read on EtoBox.
The document is a list of items with quantities and units of measurement. It includes upgrading an electrical connection from 164 kVA to 197 kVA, including a connection upgrade, power junction upgrade, and operational certification. It also includes drilling a 150 meter deep well, including the well drilling, submersible pump set, well pump panel, well permitting, and water testing from the deep well.
- Author
- Andi Wardiana
- Language
- EN