About this document
Test Before Touch Procedure Guide by Mrutyunjay Dilip Patil is a document available to read on EtoBox.
1. Obtain proper permits and ensure a safe work environment. Isolate the power source and confirm it is off before touching. 2. Identify all possible energy sources, anticipate hazards, and minimize risks. Wait if necessary for capacitors to discharge. 3. Use appropriate PPE and insulated tools rated for the voltage. Test all equipment before and after to ensure it is working properly. Confirm absence of voltage before touching terminals.
- Author
- Mrutyunjay Dilip Patil
- Language
- EN