Middle Marsyangdi Hydroelectric Project by PratikTiwari is a document available to read on EtoBox.

The Middle Marsyangdi Hydroelectric Project is a 76 MW run-of-river hydropower plant located on the middle reach of the Marsyangdi River in central Nepal. Key features include an intake weir, lateral rockfill dam, underground de-sander, 5.5 km headrace tunnel, 470 m steel penstock, and shaft powerhouse. With a design discharge of 80 m3/s and gross head of 120 m, the plant will generate an average annual energy output of 470 GWh. Total project costs are estimated at 173 million US dollars and construction to

Author
PratikTiwari
Language
EN