RLOC Plant Radiant Coil Inspection Report by Mohamed Reda Hussein is a document available to read on EtoBox.
The inspection report documents the initial inspection of radiant coils No. 69, 70, 71, and 72 for the RAS Laffan Olefins Company, conducted on December 15, 2013. The hydrostatic test was witnessed and found satisfactory, with all procedures and tests meeting the required standards. No non-conformities were reported during this visit, and the next inspection is scheduled for December 16, 2013.