About this document
Ali Baba Feb 2, 2025 9-30 PM by sanjoyroy100000000000 is a document available to read on EtoBox.
The inspection report for the Pradhan Mantri Gram Sadak Yojana (PMGSY) road T04-T01 to Bakoriya (Manika) indicates that the road, which is 26.1 KM long and has an estimated cost of 1945.15 Lakh, was initially graded as
- Author
- sanjoyroy100000000000
- Language
- EN