About this document
CNU Pre-TA Inspection Report for Loop #09A by akhilarukawal1234 is a document available to read on EtoBox.
The inspection report for Hindustan Petroleum Corporation Limited details the findings from a visual inspection and ultrasonic testing (UTG) of Loop #09A at the Visakh Refinery. Key observations include a 10" NPS line not resting on support, missing insulation on a 3" NPS line, and paint blisters on the line. Recommendations include ensuring proper support for the line, providing insulation, and cleaning and repainting damaged areas according to technical standards.
- Author
- akhilarukawal1234
- Language
- EN