About this document
Six Sigma Control Plan Template by Eshio is a document available to read on EtoBox.
1. The validated critical process steps (Xs) from the data collection plan for the SFP Urgent Care patient waiting time project include: check-in time, patient assessment time, lab test time, result assessment time, and discharge time. 2. Key indicators that affect the output metric (Y) include long check-in times from missing insurance or symptom details, patient assessment times over 8 minutes or under 3 minutes, lab test times over 20 minutes, result assessment times over 12 minutes, and discharge time
- Author
- Eshio
- Language
- EN