About this document
NKF114 DDR 1-2 by Marc Lefrancq is a document available to read on EtoBox.
The document outlines the work operations conducted on the NKF1-14 site over two days, detailing activities such as rigging up equipment, pressure testing, and attempts to retrieve a tubing hanger. Key tasks included displacing the well with brine, testing BOP rams, and using slick-line equipment for various operations. Despite multiple attempts, the retrieval of the completion from the tubing hanger was unsuccessful.
- Author
- Marc Lefrancq
- Language
- EN