About this document
CALGreen Code Project Submission Guide by Karlos Daniel Barros is a document available to read on EtoBox.
The document provides guidelines for complying with the California Green Building Standards Code (CALGreen) for projects submitted to the Division of the State Architect (DSA). Projects must comply with CALGreen Chapter 3 scoping requirements and Chapter 5 mandatory measures adopted by DSA. Measures in CALGreen Sections 5.410.2 and 5.410.4 related to commissioning and testing are not mandatory but portions are required by the California Energy Code. CALGreen Section 306 encourages voluntary measures. Attach
- Author
- Karlos Daniel Barros
- Language
- EN