Skip to content

Opening book details…

Can I read Rig Building Safety and Procedures on EtoBox?

Rig Building Safety and Procedures by Aditya Suman is a document available to read on EtoBox.

What is Rig Building Safety and Procedures about?

The document provides details on rig building procedures, including: 1) Drill site preparation, route survey, rig release/rigging down, transportation of rig equipment, and rigging up are the main activities in rig building. 2) Rig release involves lowering the mast safely and dismantling equipment, while transportation requires proper fleet selection and load securing. 3) Rigging up assembles the sub-base, erects the mast by raising the floors and equipment in stages, and ensures pins and clips are s

Author
Aditya Suman
Language
EN