Skip to content

Opening book details…

About this document

RAN Installation Verification Checklist by Adnan adnan is a document available to read on EtoBox.

This document is an installation checklist for an RAN site. It lists 30 points to verify regarding the installation, including verifying the installation was done according to the approved design, redundant power cables are installed, breakers are installed correctly, grounding is separate for the baseband equipment if installed in a TRM rack or 6150 cabinet, cables are labeled properly, fiber cables are routed correctly from the ERS to the RBS and baseband equipment, flexible pipes are used and sealed corr

Author
Adnan adnan
Language
EN