About this document
NRW Reduction Progress in 5 Towns by RAJ is a document available to read on EtoBox.
The document summarizes work being done to reduce non-revenue water in 5 major towns in the state under the AMRUT Mission. It provides details on the population covered, length of pipe to be replaced, and number of consumer connections for each town. It also outlines the status of the work, with technical clearances or tenders being invited. The work aims to reduce NRW to below 15-20% over 7 years of performance-linked operations and maintenance by the vendor. Consumer meters will have a 7-year warranty. Bu
- Author
- RAJ
- Language
- EN