Skip to content

Opening book details…

Can I read Final Inspection Report for NCC Substation on EtoBox?

Final Inspection Report for NCC Substation by bukhori is a document available to read on EtoBox.

What is Final Inspection Report for NCC Substation about?

This document is a Request for Inspection (RFI) for the final inspection of the Substation for NCC (10-SS-001) scheduled for March 11, 2025, by subcontractor PT. Tekniko Indonesia. It includes details such as inspection date, construction activity, and relevant drawings. The final inspection report will be generated following the inspection activities.

Author
bukhori
Language
EN