Retaining Wall Cost and Labour Analysis by Sanjay Kumar is a document available to read on EtoBox.
What is Retaining Wall Cost and Labour Analysis about?
The document provides rate analyses for various construction items based on the Delhi Analysis of Rates (DAR) 2019. The first section provides the rate analysis for 1 cubic meter of PCC work up to plinth level using a mix of 1:3:6. The rate is estimated to be Rs. 50.39 per cubic meter or Rs. 50 per cubic meter. The second section provides the rate analysis for shuttering and centering work for foundations/footings of size 2.7m x 2.7m x 1m. The estimated rate is Rs. 1515.93 per 10.80 square meters or Rs.