About this document
Factory Acceptance Test for I.C. Engines by saeed ghafoori is a document available to read on EtoBox.
The factory acceptance test and shipboard trials for I.C. engines involves three stages: 1) Safety precautions to protect personnel, 2) General requirements such as run-in and test facilities, and 3) Works trials to verify design and collect baseline data. The works trials test engines at 100%, 110%, 90%, 75%, 50%, and 25% load to record operating parameters twice at maximum continuous rating. Shipboard testing may verify inspections and testing done at the factory. Test loads and duration vary depending on
- Author
- saeed ghafoori
- Language
- EN