Can I read HDD Procedure for Gas Pipeline Installation on EtoBox?
HDD Procedure for Gas Pipeline Installation by Bubu Keke Caca is a document available to read on EtoBox.
What is HDD Procedure for Gas Pipeline Installation about?
This document provides the horizontal directional drilling (HDD) procedure for crossing the HDD Pengapon location as part of a project to install a SPM with 50,000 DWT capacity and pipeline to the Pengapon TBBM in Semarang. It details the HDD methodology, drilling plan, working method, schedule, mechanical layout, equipment list, safety plan, and HSE documentation requirements. The contractor will supervise the subcontractor to ensure work is completed according to drawings, specifications, and requirements