Bridge Cost Estimation Process Guide by Miljan Kovacevic is a document available to read on EtoBox.
The document provides guidance on a three-step process for cost estimating bridge structures during development. Step one involves estimating costs of components like substructure items (pilings, drilled shafts, walls), superstructure items (girders, bearings, concrete), and miscellaneous items (MSE walls, sound barriers, detour bridges) using provided unit costs. Step two adjusts the total cost based on site-specific conditions. Step three compares the estimated total cost per square foot to historical cos