About this document
Feasibility Study of BOT Road Project by Yasir Nasim is a document available to read on EtoBox.
This document summarizes a study on the feasibility and risks of a Build-Operate-Transfer (BOT) road project for a 25.31 km stretch of National Highway No. 50 from Nashik to Sinner in Maharashtra, India. The study involved collecting input data on the project costs, means of financing, cash flows, and risks. Financial analyses were conducted including calculating the average rate of return, payback period, and net present value to evaluate the feasibility and risks. The net present value was found to be pos
- Author
- Yasir Nasim
- Language
- EN