About this document
Aman Spinning. (33 KV Pre-Comissioning Test Report) Date1.2 by max max is a document available to read on EtoBox.
The document is a Pre-Commissioning Test Report for Aman Spinning Mills Ltd., detailing various tests performed by Betelco on electrical equipment including substations, circuit re-closers, and transformers. It includes equipment data, insulation resistance tests, mechanical tests, and functional tests, confirming that all tested equipment passed the required standards. The report is dated March 28, 2026, and includes signatures from various engineers and managers involved in the testing process.
- Author
- max max
- Language
- EN