Asphalt Laying and Production Report by Engr Ghulam Mustafa is a document available to read on EtoBox.

What is Asphalt Laying and Production Report about?

The document contains asphalt laying and production reports from multiple dates between 4-8-2015 to 14-8-2015 for the NKB site. It lists details of dumper trucks including arrival time, temperature, quantity of asphalt laid and production totals each day. The total quantity of asphalt laid was 362.135 tons between 4-8-2015 to 12-8-2015 and 126.25 tons and 226.93 tons on 13-8-2015 and 14-8-2015 respectively.