About this document
Ceilcote 242MR Installation Guide by Kurnia Aryadi is a document available to read on EtoBox.
This document provides installation procedures for applying a Ceilcote 242MR Flakeline lining to the concrete absorber and mixing zone of an aeration basin for a coal-fired power plant project in Central Java, Indonesia. It specifies surface preparation requirements, application of the lining, inspection and testing procedures, and safety considerations. The applicator must be approved and have experience applying similar lining systems. The procedures are intended to ensure proper installation and protecti
- Author
- Kurnia Aryadi
- Language
- EN