Skip to content

Opening book details…

Can I read Pavement Design Report for CTH ZZ Reconstruction on EtoBox?

Pavement Design Report for CTH ZZ Reconstruction by Shashank Raj Lamichhane is a document available to read on EtoBox.

What is Pavement Design Report for CTH ZZ Reconstruction about?

This pavement design report provides recommendations for reconstructing 3.6 miles of CTH ZZ in Brown County, WI. The recommended pavement structure consists of 4.5 inches of HMA over 6 inches of dense-graded base aggregate and 12 inches of breaker run subbase. Traffic volumes are expected to increase from 2200 vpd in 2019 to 2950 vpd in 2039. Life cycle cost analysis found concrete to be the lowest cost option, but HMA is within 5% and is preferred by the local agency.

Author
Shashank Raj Lamichhane
Language
EN

More by Shashank Raj Lamichhane

Browse all works by Shashank Raj Lamichhane