Skip to content

Opening book details…

About this document

LINKPlanner Report: FORO to BOQUERON by mauricio diaz is a document available to read on EtoBox.

The LINKPlanner Installation Report details the configuration and performance expectations for the link between FORO 4 LA GRAN VIA and BOQUERON, utilizing PTP670 equipment over a distance of 7.309 kilometers. The report includes specifications such as expected throughput of 341.15 Mbps, Fresnel zone clearance of 3.4 meters, and various installation notes for both locations. Additionally, it outlines the bill of materials and regulatory conditions relevant to the installation process.

Author
mauricio diaz
Language
EN