About this document
Tarum Elementary School Repair Report by Nonz Estabella Dacillo is a document available to read on EtoBox.
The Pre-Inspection Report details the planned repairs at Tarum Elementary School, including the replacement of toilet bowls and flooring in specific classrooms. The inspection took place on January 7, 2025, and was conducted by the Head of the Inspectorate Team and the School Principal. The report includes signatures from relevant officials, indicating their approval and acknowledgment of the inspection findings.
- Author
- Nonz Estabella Dacillo
- Language
- EN