About this document
Concrete Curing Guidelines and Standards by Ah Rashed is a document available to read on EtoBox.
This document provides standards and requirements for curing concrete specimens and structures. It specifies that concrete must be maintained above 10°C and in a moist condition for at least 7 days after placement, or 3 days for high-early-strength concrete. Accelerated curing using steam or heat is allowed if it provides equal or higher strength than standard curing. Test specimens must be cured and tested according to ASTM standards to ensure curing is adequate and concrete reaches the required design str
- Author
- Ah Rashed
- Language
- EN