Can I read FAR - GVR Construction on EtoBox?
FAR - GVR Construction by SAICORP pvt ltd is a document available to read on EtoBox.
What is FAR - GVR Construction about?
The Failure Analysis Report for GVR Constructions details a complaint regarding a non-rotating trolley wheel on a PG500-175 model, with 126 running hours since commissioning on 05/06/2023. Inspection revealed that the brake drum cover was missing, causing the brake shoes to rub against the drum, necessitating a replacement of the brake drum assembly. The failure is covered under warranty, and the necessary repairs will be conducted free of charge.
- Author
- SAICORP pvt ltd
- Language
- EN