About this document
Deck Slab Bridge Compliance Report by Chethan Gowda is a document available to read on EtoBox.
The document discusses 4 observations from a compliance report for a bridge design. It was observed that the bridge design considered the proper soil bearing capacity and effective span. It was also observed that a higher discharge value was used for design according to local flooding conditions. The abutment design was changed to remove raft steel. The pier design considers both axial and transverse moments and stresses are within limits.
- Author
- Chethan Gowda
- Language
- EN