Opening book details…
Can I read Garri Production Line Equipment Quote on EtoBox?
Garri Production Line Equipment Quote by Abubakarr Sesay is a document available to read on EtoBox.
What is Garri Production Line Equipment Quote about?
This document provides details on a 1 ton per hour (TPH) cassava garri production line that produces 20 tons of dried garri per day over 20 hours of operation. The total cost for the 26 set production line is $153,000 FOB Qingdao, China and will be shipped in 2 40HQ containers. The line includes equipment for washing, peeling, grinding, pressing, frying, milling and packaging the cassava into dried garri granules. Engineering costs for installation and debugging are additional.
- Author
- Abubakarr Sesay
- Language
- EN