About this document
RFA Elec 004 (Rev 05) Electrical System Reply by Eiei Khaing is a document available to read on EtoBox.
The document is a Request for Approval (RFA) from Min Dhama Company (MDC) to Seek International (SI) regarding the shop drawing submission for the electrical system of the Yum Yum Noodle Factory project. The submission includes various components such as shop drawings, method statements, and materials, with a response required by December 28, 2025. The consultant has approved the resubmitted drawings with comments, emphasizing the need for coordination with other MEP services and detailed installation drawi
- Author
- Eiei Khaing
- Language
- EN