Skip to content

Opening book details…

About this document

Innovative Shoring for Urban Excavation by shreker is a document available to read on EtoBox.

The document discusses an innovative shoring design for a 60-foot-deep excavation in downtown Seattle for the Tower 12 project, which involved combining soil nailing and anchored soldier piles to accommodate urban site constraints. This hybrid support system eliminated the need for internal bracing, thus reducing construction costs and time, while performance monitoring confirmed that deflections remained within acceptable limits. The project highlights the effectiveness of integrating different excavation

Author
shreker
Language
EN