What is NCT Project Daily Report: April 3, 2011 about?
The daily report summarized the status of various issues for the NCT Back-up Project as of April 3, 2011. Dredging had procured 261,000 cubic feet of material. 186 piles had been installed for the PVD system. Interlocking block production was at 38,000 cubic feet. Administrative permission was in progress for railway and electric line relocation. Drain work was ongoing at the western end. RCC drainage pipe production was at 316 cubic feet. Ground improvement involved surcharge filling and sand bagging along