Substation Power Outage Report by Ndungutse B. Oliver is a document available to read on EtoBox.
The document reports a power outage from the Camp Belge-Gakenke substation feeder called GISENYI between October 3, 2020 from 3:19 PM to 3:49 PM. Six power distribution transformers were affected, disconnecting over 1000 customers. The outage was caused by earth faults and loss of supply, and each proposed outage was approved and matched the actual outage times and status.