Detailed Cost Breakdown for Engineering by Jescel Araracap is a document available to read on EtoBox.
What is Detailed Cost Breakdown for Engineering about?
The document provides a detailed breakdown of costs for phase 2 of detailed engineering works. It lists 5 items of work including canal location, damsite survey, parcellary survey, design and supplies, and POW preparation. The total direct cost for all items is 228,040.07 pesos, with the majority of costs going towards labor. Additional indirect costs include contingencies at 10% of direct costs, GESA at 3.5% of direct costs, and a management fee at 5% of direct costs. The total projected cost for the detai