Skip to content

Opening book details…

About this document

Saudi Aramco ITP for Equipment Erection by Delta akathehusky is a document available to read on EtoBox.

This inspection test plan outlines quality control activities for the erection and alignment of rotating equipment. It includes 6 steps: 1) Reviewing method statements and foundation preparation documents; 2) Inspecting components upon receipt; 3) Checking the orientation, plumbing, and level of equipment during erection; 4) Monitoring grouting activities; 5) Conducting final dimensional and functional checks; and 6) Reviewing final acceptance documents. The plan identifies acceptance criteria, responsible

Author
Delta akathehusky
Language
EN