About this document
Tubing Inspection Offer for Benghazi by altawarge ahmad is a document available to read on EtoBox.
DYMOMA Co. has provided a tubing inspection offer for 80,000 ft of tubing in Benghazi, detailing various non-destructive testing methods and their associated costs. The total price for wall thickness measurement is $97,900, with specific terms and conditions outlined for the service. Payment is structured in two invoices, with 30% due upon mobilization and 70% at the end of work.
- Author
- altawarge ahmad
- Language
- EN