About this document
Laporan Pengiriman Material Konstruksi by ahmad saiful is a document available to read on EtoBox.
The document outlines various transportation and material delivery details for January 13, 2025, including costs for stone, gravel, and soil waste disposal. It lists individual trips, costs, and total amounts for each category, culminating in a grand total of Rp 3,320,000. Additionally, it details the wages for drivers associated with these deliveries, also totaling Rp 3,320,000.
- Author
- ahmad saiful
- Language
- EN