Can I read Daily Site Report for May 2, 2013 on EtoBox?
Daily Site Report for May 2, 2013 by Wr Ar is a document available to read on EtoBox.
What is Daily Site Report for May 2, 2013 about?
C & V Engineering Pte Ltd prepared a daily site report for Contract ER420, a new link road between Upper Changi Road and Upper Changi Road East. On May 2nd from 8:30am to 6pm, welding machines and generators were mobilized at Chainage 0800-1800. Earthworks and slope cutting were ongoing. A drill machine was also mobilized for instrumentation work. Soil disposal works continued. The site representative was Alfredo Jr. Arios Claro. Photos from the site visit on May 2nd were attached.
- Author
- Wr Ar
- Language
- EN