About this document
HMA Paving Diary Template by bestoon Ramadhan is a document available to read on EtoBox.
The document summarizes information from a highway paving project on September 18, 2014 on IH 94 in Eau Claire County, Wisconsin. It includes details on the project location and description, mix design, paving times and temperatures, material quantities, rolling pattern, and notes from inspection. Over 9,200 tons of asphalt were laid between stations 646+00 and 220+00 in two lifts at a total planned thickness of 4.5 inches for resurfacing work.
- Author
- bestoon Ramadhan
- Language
- EN