About this document
Energy Audit of 450 MW Power Plant by Udhayakumar Venkataraman is a document available to read on EtoBox.
This document summarizes an energy audit of a 450 MW combined cycle power plant in Pakistan. The plant consists of two 150 MW gas turbines and one 150 MW steam turbine. The study analyzes the performance of the gas turbines, steam turbine, and heat recovery steam generator unit. For the gas turbines, parameters like fuel quality, compressor performance, and ambient conditions are examined. The steam turbine and entire steam circuit, including the condenser, are also assessed. An energy balance is performed
- Author
- Udhayakumar Venkataraman
- Language
- EN