About this document
Ie Thermal Packer Wellsite Procedure by Stuti is a document available to read on EtoBox.
This document outlines the wellsite procedure for the installation and release of a 7" X 3-1/2" IE Thermal Packer with a 20ft Expansion Joint for the Oil India project in Bhagewala Field, Jaisalmer. It includes detailed sections on objectives, tool specifications, safety requirements, required hand tools, pre-RIH checks, RIH procedures, pressure testing, and release procedures. The document is intended for internal evaluation and contains confidential information from Schlumberger.
- Author
- Stuti
- Language
- EN