Skip to content

Opening book details…

Can I read Material Balance in Reservoir Engineering on EtoBox?

Material Balance in Reservoir Engineering by Idrissa Ba is a document available to read on EtoBox.

What is Material Balance in Reservoir Engineering about?

Np = 0.5 x 8 x 106 x (1.45 - 1.3) = 0.5 x 8 x 106 x 0.15 = 0.6 x 106 stb Given: N = 8 x 106 stb Boi = 1.3 rb/stb Bo = 1.45 rb/stb No water drive or gas cap (b) Same as (a) but includes water expansion term: Np = 0.5 x 8 x 106 x (1.45 - 1.3) + 0.3 x 8 x 106 x 3 x 10-6 x (3000 - 2500) = 0.6 x 106 + 0.12 x 106 = 0.72 x

Author
Idrissa Ba
Language
EN

More by Idrissa Ba

Browse all works by Idrissa Ba