This document provides a work schedule for replacing booster pump BFPT 2A and 2B at a power plant over a 30 day period from December 2019 to January 2020. The schedule details the preparation, dismantling, installation, and commissioning activities to be completed each week. Key steps include shutting down the plant, isolating and locking out power and piping lines, dismantling the existing pumps and piping, installing new pump baseplates and piping, and performing pre-alignment, testing and commissioning o