About this document
Substation Construction Specifications by Deepak Rajan is a document available to read on EtoBox.
This document outlines the scope of works for power network diversion related to Port Sultan Qaboos Phase 1 demolition and construction. It includes relocating several existing 11/0.4kV substations to new locations in stages while maintaining power supply. The contractor will build new substations, lay cables, make connections, and commission the temporary diversion network per MEDC standards and specifications. Electrical works must be permitted and coordinated with MEDC and Port Authority.
- Author
- Deepak Rajan
- Language
- EN