Can I read Operations Daily Report 14.04.2026 on EtoBox?
Operations Daily Report 14.04.2026 by Hisham Al-Assar is a document available to read on EtoBox.
What is Operations Daily Report 14.04.2026 about?
The operations report for April 14, 2026, indicates that the plant is currently shut down with various systems under dry or wet preservation. Routine activities included checks on generators and pumps, while main activities involved maintenance and testing of equipment, particularly GT22 and the Olympian DG. Future work includes system flushing for ST20 and continued maintenance on HRSG motorized valves.
- Author
- Hisham Al-Assar
- Language
- EN