Integral Bridge Abutment Connection Report by Bogdan Hritcu is a document available to read on EtoBox.
This document summarizes research on integral bridge abutment-to-approach slab connections. Two bridges were instrumented with sensors to monitor temperature, strains in the abutments, girders, approach slabs, post-tensioning strands, joints, and piles. A precast approach slab was used for one bridge and a cast-in-place slab for the other. Data was collected over time to evaluate performance and impacts. The integral connections performed well with no observed distress. Connecting the approach slabs impacte