About this document
MCP-2F MAR Resubmission Clarifications by efmartin21 is a document available to read on EtoBox.
1. The document provides clarification to comments on a previous MCP-2F MAR resubmission. It addresses 14 points relating to equipment load capacities, wire specifications, indicating faults and statuses, nameplate sizes, device positioning, cable sizes, following previous comments and specifications. 2. For each point, the response provides details on how the feedback will be incorporated such as revising capacities before production, using 1.25mm control wires, adding ammeters, repositioning devices bel
- Author
- efmartin21
- Language
- EN