About this document
Initial Tile Inspection Schedule by Rhonabel Corpuz is a document available to read on EtoBox.
The document outlines the initial tile inspection schedule for Tower C and Tower D, detailing inspection dates for each section (A-G) on the 24th and 25th floors. Tower C inspections are scheduled between May and July 2025, while Tower D inspections occur in June and July 2025. Each section has specific dates assigned for the inspections.
- Author
- Rhonabel Corpuz
- Language
- EN